Preparation method of carbon steel pipe

2024-01-31


The raw material of carbon steel pipe is round tube blank, which needs to be cut and processed by a cutting machine to form a billet with a length of about 1 meter, and then sent to the furnace for heating through a conveyor belt. The billet is fed into the furnace for heating, with a temperature of approximately 1200 degrees Celsius.

What are the inspection standards for color coated rolls

2024-01-31


Inspect the appearance of the color coated roll, including the smoothness, color, and absence of obvious scratches, dents, bubbles, foreign objects, etc. on the coating surface. The appearance requirements should meet the product specifications and relevant national standards.

< 12 >